This is a new construction home that is about 70% done. (in north Chico off of Spyglass) We rough wired it a couple months ago and since then it's been sheet rocked, painted and cabinets are installed but the flooring and tile work inside are left before we will install lights, plugs, appliances, switches Etc.
We were able to finish our Solar Installation today (our 6th one) and test it out!
All that's left is an inspection by the county, then PG&E will change out the existing meter with a bi-directional one that will keep track of the electricity flowing back out of the solar system to the grid.
Thanks to Mark Brown for his help today with the installation!